County/Municipality Ordinance Title Number Chapter Chapter
Box Elder Construction Subject to Geologic or Flood Hazards 1.35 General and Supplementary Provisions  
Emery County EXPOSED SLOPES TO BE LESS THAN THE CRITICAL ANGLE OF REPOSE - EXPOSED AREAS TO BE RE-VEGETATED - EXCEPTION 6,16 Supplementary Regulations to Zones  
Kanab Construction Subject to Geological, Flood, or Other Natural Hazards Section 11 ZONING ORDINANCES  
Logan Construction Materials and Methods 17.26.140 Flood Hazard (FH) Combining Zoning District  
Mapleton Grading 18.30.080a CE-1 CRITICAL ENVIRONMENT ZONE  
Mapleton Cuts And Fills 18.30.080d CE-1 CRITICAL ENVIRONMENT ZONE  
Morgan Construction Subject to Geologic or Flood Hazards. 16-01-290 Introductions, General and Supplementary Provisions  
Salt Lake County Construction or development--Special approval required. 19.74.080 FLOODPLAIN HAZARD REGULATIONS  
Salt Lake County Construction or development--Duties of director of development services division. 19.74.090 FLOODPLAIN HAZARD REGULATIONS  
Salt Lake County Anchoring. 19.74.110 FLOODPLAIN HAZARD REGULATIONS  
Salt Lake County Construction materials and methods. 19.74.120 FLOODPLAIN HAZARD REGULATIONS  
Salt Lake County Residential construction. 19.74.160 FLOODPLAIN HAZARD REGULATIONS  
Salt Lake County Nonresidential construction. 19.74.170  FLOODPLAIN HAZARD REGULATIONS  
Sandy Development Standards within the Sensitive Area Overlay Zone 15.08.03E Special Purpose and Overlay Districts  
Sandy Development Standards withing Flood Plain Overlay District 15.08.04P Special Purpose and Overlay Districts  
Summit, Eastern Summit FLOOD HAZARD REDUCTION GENERAL STANDARDS: 12.4.1 FLOOD CONTROL  
Summit, Eastern Summit FLOOD HAZARD REDUCTION SPECIFIC STANDARDS: 12.4.2 FLOOD CONTROL  
Washington CONSTRUCTION SUBJECT TO GEOLOGIC, FLOOD OR OTHER NATURAL HAZARDS PURPOSE: 10.20.1 CONSTRUCTION SUBJECT TO GEOLOGIC, FLOOD OR OTHER NATURAL HAZARDS  
Washington REQUIREMENTS: C. Applicability Of Flood Control Ordinance 10.20.2 CONSTRUCTION SUBJECT TO GEOLOGIC, FLOOD OR OTHER NATURAL HAZARDS  
Washington REQUIREMENTS: 10.20.2 CONSTRUCTION SUBJECT TO GEOLOGIC, FLOOD OR OTHER NATURAL HAZARDS  
Washington GENERAL STANDARDS: A. Anchoring: 12.5.1 FLOOD CONTROL  
Washington FENCING PLAN APPROVAL: 9.5.1 BUILDINGS, LAND AND CONSTRUCTION  
Washington GRADING OR MODIFYING SURFACES: 9.5.2 BUILDINGS, LAND AND CONSTRUCTION  
Washington FENCING COMPLETED PRIOR TO SURFACE MODIFICATION: 9.5.3 BUILDINGS, LAND AND CONSTRUCTION