| County/Municipality | Ordinance Title | Number | Chapter | Chapter |
| Box Elder | STREET GRADES | 7.7.21.17 | Conditional Uses | |
| Davis Subdivision | Road subgrade preparation. | 15.04.700 | Subdivisions | |
| Davis Subdivision | Base course. | 15.04.850 | Subdivisions | |
| Davis Subdivision | Bituminous surface course. | 15.04.860 | Subdivisions | |
| Davis Subdivision | Bituminous plant mix seal coat. | 15.04.870 | Subdivisions | |
| Davis Subdivision | Spreading and compaction. | 15.04.890 | Subdivisions | |
| Davis Subdivision | Weather limitations. | 15.04.900 | Subdivisions | |
| Davis Subdivision | Bituminous seal coat. | 15.04.910 | Subdivisions | |
| Davis Subdivision | Test strip. | 15.04.920 | Subdivisions | |
| Davis Subdivision | Generally. | 15.04.930 | Subdivisions | |
| Davis Subdivision | Gravel surface. | 15.04.940 | Subdivisions | |
| Davis Subdivision | Bituminous surface. | 15.04.950 | Subdivisions | |
| Davis Subdivision | Concrete surfaces. | 15.04.960 | Subdivisions | |
| Juab | ROAD WIDTH | 12.1.2106 | Definitions | |
| Kanab | ROAD SUB-GRADE PREPARATION | 3.4 | DESIGN STANDARDS | |
| Kanab | Roadway Construction | Section 4 | DESIGN STANDARDS | |
| Mapleton | STREETS AND ROADS; DESIGN STANDARDS | 17.12.050 | DESIGN STANDARDS AND CRITERIA | |
| Mapleton | Grading | 17.12.080c | DESIGN STANDARDS AND CRITERIA | |
| Summit, Eastern Summit | INFRASTRUCTURE STANDARDS: C.Road Standards: | 11.6.9 | GENERAL REGULATIONS | |
| Summit, Eastern Summit | INFRASTRUCTURE STANDARDS: D.Road Grades: | 11.6.9 | GENERAL REGULATIONS | |
| Summit, Snyderville Basin | G. Road Base Specifications: | 10.4.10 | STANDARDS FOR APPROVAL OF DEVELOPMENT PERMITS | |
| Summit, Snyderville Basin | D. Road Infrastructure Design: | 10.4.10 | STANDARDS FOR APPROVAL OF DEVELOPMENT PERMITS | |
| Summit, Snyderville Basin | C. Road Grades: | 10.4.10 | STANDARDS FOR APPROVAL OF DEVELOPMENT PERMITS | |
| Summit, Snyderville Basin | J. Road Maintenance: | 10.4.10 | STANDARDS FOR APPROVAL OF DEVELOPMENT PERMITS | |
| Summit, Snyderville Basin | K. Level Of Service Standards: | 10.4.10 | STANDARDS FOR APPROVAL OF DEVELOPMENT PERMITS | |
| Summit, Snyderville Basin | E. Installation Prior To Road Surfacing: | 10.4.11 | STANDARDS FOR APPROVAL OF DEVELOPMENT PERMITS | |
| Washington | STREET DESIGN: | 10.24.8 | HILLSIDE DEVELOPMENT STANDARDS |